Home › Resources › How to document a water mitigation Xactimate estimate

How to document a water mitigation Xactimate estimate

By the Log Cabin team

A water mitigation Xactimate estimate is usually reviewed by someone who never saw the job. They weren't there when the crew pulled baseboard in the middle of the night, and they didn't see the wet cavity behind the vanity. All they have is the file. If the file doesn't show why a line is there, expect questions.

The good news: most of what supports a mitigation estimate is already being collected on the job. It just has to be captured consistently and handed over in a form an estimator can write from. Here's what we look for when a mitigation file comes in.

Start with the moisture map, not the invoice

The scope of a water mitigation estimate comes from where the water went. That means initial moisture readings, taken and recorded before anything is removed, room by room.

A useful moisture map shows:

When the readings show a wall was wet partway up, a flood cut just above that line makes sense on paper. When the readings are missing, the same line is just an opinion.

Photos that match the estimate, room by room

Photos are the primary evidence for every line. A mitigation estimate built from the crew's invoice alone tends to miss things the photos show and include things they don't.

Before you send the file, check that you have:

Label photos by room. An estimator matching a pile of unlabeled photos to a sketch is slower, and slower means more chances to miss something.

Drying logs that show the job, day by day

The drying log is what supports the day-based lines on a water mitigation estimate: equipment days, monitoring visits and the drying timeline. Reviewers commonly ask for it, so it's worth getting right before the file goes out.

A drying log that holds up shows:

The IICRC S500 is the industry standard for water damage restoration, and documenting the job against it is the clearest way to explain why the drying took the time and equipment it did. If a piece of equipment stayed longer than expected, the log should say why: a wall cavity that was slow to come down, a material that needed more time, access issues. A note written on the day carries more weight than an explanation written weeks later.

Equipment placement and pickup records

Equipment lines are easy to question and easy to support. The record should tie each piece of equipment to a room and a date range. A placement diagram or photo of the setup in each room helps, and so does a pickup record that matches the log.

If the equipment count changes partway through the job, make sure the log, the photos and the invoice all tell the same story. Mismatches between those three give a reviewer a reason to slow the file down.

Don't forget the job-level items

Some mitigation lines aren't tied to one room, and they get missed because nobody photographs them. Look at whether the file supports:

Each of these needs something in the file that shows it happened. "We always do that" doesn't help a reviewer who wasn't there.

Write it so the reviewer can follow it

Once the documentation is in hand, the estimate itself should make it easy to check:

A quick pre-send checklist

If the file has all of that, a mitigation estimate can be written line by line from the evidence, and every line has something behind it.

Need a water mitigation Xactimate estimate written from your documentation? See our mitigation estimating service or send us a file.

Send a fileCall 334-843-0750